éolien en mer

Pleione

Baltic Sea, east of Gotland, Suède

Stade
En cours de développ­ement
Emplacement
Baltic Sea, east of Gotland
Date de demarrage
2030
Production
5 TWh
Capacité
1,05 GW

À propos du projet

Energy farm Pleione will help increase the availability of fossil-free energy in Sweden and strengthen the electricity capacity on Gotland. With its geographical location, established industries, innovative entrepreneurial spirit, and thriving agriculture, Gotland is well-positioned to drive Sweden’s transition journey. 

Energy farm Pleione can generate 5 TWh of fossil-free electricity annually, which corresponds to 3.7 percent of Sweden’s current electricity needs. The availability of fossil-free energy and increased electricity capacity provides opportunities to further process electricity into hydrogen and other e-fuels that can serve as energy carriers for storage purposes, fuels, replacements for fossil fuels in industry, or to produce green fertilizers. 

Energy farm Pleione consists of 42–70 wind turbines and is planned to also have hydrogen facilities on specific platforms or on the foundations of the wind turbines. The total height of the wind turbines will be up to a maximum of 370 meters. The farm is planned to be operational by 2030. 

Energy farm Pleione is being developed simultaneously with the sister project wind farm Ran, which you can read about here. 

More information about the project can be found in Swedish.  

Oxygenation of the Baltic Sea 

Together with SMHI, Stockholm University, and NORCE, OX2 is participating in the research project BaltVent on the possibility of oxygenating the deep waters of the Baltic Sea with oxygen from hydrogen production in connection with offshore wind power. 

In partnership with Ingka Investments 

OX2 is developing Pleione together with Ingka Investments, part of the IKEA sphere, which is a co-owner of the project. The IKEA sphere is a long-term owner with high climate goals. They invest heavily in renewable energy production and currently own over 2 GW of renewable production. Read more here. 

Pour des informations complémentaires rendez-vous sur le site Suédois Suédois

Faits marquants

Faits marquants du projet

Technologie
éolien en mer
Stade
En cours de développ­ement
Emplacement
Baltic Sea, east of Gotland
éoliennes
42-70
hauteur
max 310 m
Date de demarrage
2030
Production
5 TWh
Capacité
1,05 GW

Visualiseringar

Här kan du ta del av fotomontage för energiparken Pleione och dess systerprojekt vindparken Ran.

Här finner du underlagen

Vindkraft för ett friskare hav – så kan havsbaserad vindkraft syresätta Östersjön

Kan vindkraften verkligen bidra till att få tillbaka torsken i Östersjön? Ja, det tror vi på OX2. Nu deltar vi i forskningsprojektet BaltVent tillsammans med SMHI, Stockholms Universitet och The Norwegian Research Center (NORCE) för att ta reda på om det är möjligt och hur det i så fall kan göras. 

Läs artikeln om syresättning av bottenvatten i Östersjön

Frågor och svar

Här ger vi svar på de vanligaste frågorna om havsbaserad vindkraft och energipark Pleione.

Frågor och svar

Pour en savoir plus

Informations générales
pleioneran@ox2.com

Contacts projet Pleione

Chef de projet
Elina Cuéllar

+46 702 24 34 67
elina.cuellar@​ox2.com

Directeur régional
Lise Toll

+46 76 109 59 33
lise.toll@​ox2.com