Skip to main contentSkip to navigationSkip to search
Logotype

Onshore wind power

Wysoka

Wysoka, Poland

Phase
In operation
Location
Wysoka
Commissioned
2024
Production
180 GWh

About the project

OX2 has completed the construction of the Wysoka wind farm. The company was involved in the investment as a turnkey developer for investor Ingka Investments.  

The wind farm consists of 11 turbines with a total capacity of 62.5 MW. The estimated annual energy production will be 180 GW, covering the electricity needs of nearly 90,000 households. Nordex N149 turbines with a capacity of 5.5-5.7 MW have been installed on the farm. The total height of each windmill reaches almost 200 metres, comprising 125-metre towers and 72.4-metre blades. The project was finalised for operation in 2024.   

OX2 is responsible for the technical and commercial management of the project.  

Want to find out more?  

Feel free to contact us about the project Wysoka   

Kasper Kowalewski  

kasper.kowalewski@ox2.com  

+48 571 445 871 

Key facts

Project key facts

Technology
Onshore wind power
Phase
In operation
Location
Wysoka
Number of turbines
5,5-5,7 MW
Commissioned
2024
Production
180 GWh
Contractor
Nordex, Elemont, Mega