Salo-Ylikoski wind farm is located in Kauhava city, Finland.

The wind farm will consist of 7 wind turbines with a total capacity of 44,8 MW. The total height of the turbines is 240 meters. The estimated annual production of the wind farm is 146 GWh which is equivalent to the annual electricity consumption of about 29,000 households (5,000 kWh/household).

The construction of the Salo-Ylikoski wind farm started in 2025. The wind farm is scheduled to be completed for commercial use in 2027. 

Key facts

Project key facts

Technology
Onshore wind power
Phase
Under­ construction
Location
Kauhava
Number of turbines
7
Height
240 m
Production
124 GWh

Yrittäjän yhteydenottolomake

Käytämme uusiutuvan energian hankkeissamme mahdollisuuksien mukaan paikallisia palveluita ja työvoimaa. Mikäli haluat tarjota oman yrityksesi palveluita Salo-Ylikosken tuulipuiston rakennusvaiheeseen, voit täyttää yhteydenottolomakkeen alla olevasta linkistä.

Lisää lomakkeeseen yrityksesi yhteystiedot sekä lyhyt kuvaus tarjoamistasi palveluista (esim. maanrakennustyöt, betonityöt, aurauspalvelut, siivouspalvelut, majoituspalvelut, ruokailu). 

Käymme kaikki yhteydenotot läpi ja otamme sinuun yhteyttä, mikäli palveluitasi voitaisiin hyödyntää Salo-Ylikosken hankkeessa! 

Täytä yhteydenottolomake tästä

Hankkeen uutisia

Do you want to know more?

Project contacts for Salo-Ylikoski

Project manager
Olli Takalammi

+358 400 913 788
olli.takalammi@​ox2.com

Land use manager
Lauri Laitila

+358 40 156 1155
lauri.laitila@​ox2.com