Energie solaire
Huittinen
Huittinen, Finlande
- Stade
- En cours de développement
- Emplacement
- Huittinen
- Production
- 475 GWh
- Capacité
- 475 MW
À propos du projet
The Huittinen solar power project is located in the municipality of Huittinen in Satakunta region, Finland. The planned capacity of the project is 475 MW. Once completed, the annual energy production of the solar farm is estimated to be approximately 475 GWh, which corresponds to the annual electricity consumption of almost 95,000 households (5,000 KWh per household).
OX2 acquired the project rights to the solar farm from Finnish solar power developer SAJM Holding in April 2023.
What's next?
The environmental impact assessment and permit processes for the project are currently underway and the aim is to complete them during 2024. The final size of the solar farm will be specified during the permitting and planning processes.
The aim is to have the investment decision to build the project in 2025 and for construction work to begin in 2025-2026. The solar power farm is estimated to start operating in 2027.
More information about the project can be found in Swedish and Finnish.
Pour des informations complémentaires rendez-vous sur le site Finlandais Suédois Et Finlandais
Faits marquants
Faits marquants du projet
- Technologie
- Energie solaire
- Stade
- En cours de développement
- Emplacement
- Huittinen
- Production
- 475 GWh
- Capacité
- 475 MW
Développement durable
Développement durable
OX2 et nos fournisseurs sont des invités dans les communautés locales. Pour nous, il est extrêmement important de créer un dialogue et de respecter les personnes qui vivent et travaillent dans la région. Cela inclut une communication transparente, la création d'emplois locaux, le développement du secteur des entreprises ou des subventions financières via des fonds communautaires ou des impôts fonciers, en fonction du marché et des conditions de la région.
L'expansion des énergies renouvelables ne doit pas se faire au détriment de la nature, et cela ne nous suffit pas pour atténuer le changement climatique. Nous travaillons depuis longtemps pour minimiser notre impact négatif sur la nature et prenons maintenant des mesures décisives pour atteindre notre objectif de parcs éoliens et solaires positifs pour la nature d'ici 2030.
Nos projets sont durables par conception, de la planification initiale à la construction et à la gestion.
Dénonciation
Dénonciation
Grievance and complaints
The grievance mechanism is targeted towards individuals, communities and companies who have feedback or concerns regarding our projects.
OX2 takes all complaints seriously and aims to acknowledge and resolve complaints promptly. A complaint is a formal expression of dissatisfaction made to or about OX2, related to its project development, construction, operation, or a staff member.
We acknowledge that anyone has a right to lodge a complaint and we will ensure that all the complaints we receive will be managed respectfully, objectively, and efficiently.
Havainnekuvia Huittisten aurinkopuistosta
Havainnekuva Huittisten aurinkopuistosta. Kuva: Voima Graphics
Havainnekuva Huittisten aurinkopuistosta. Kuva: Voima Graphics
Havainnekuva Huittisten aurinkpuistosta. Kuva: Voima Graphics
Huittisten aurinkopuiston asukaslehti
Huittisten aurinkopuiston asukaslehti kertoo hankkeen tuoreimmat kuulumiset, tekee tutuksi hankkeessa työskenteleviä henkilöitä ja tarjoaa tietoa aurinkovoimasta. Lehti on jaettu painettuna alueen koteihin ja sen digiversioon voit tutustua alla olevasta linkistä.
Kysymyksiä ja vastauksia aurinkovoimasta
Mitä tarkoittaa teollisen mittakaavan aurinkovoimala? Mitä hyötyä suurista aurinkovoimahankkeista on? Mikä on aurinkovoimalan käyttöikä? Näihin ja moneen muuhun kysymykseen löydät vastaukset koostamastamme materiaalista.
Hankkeen uutisia
2024
Huittisten aurinkovoimahanke etenee jatkosuunnitteluun – YVA-selostus valmistui elokuussa
2023
OX2 ja SAJM Holding yhteistyöhön 475 megawatin aurinkovoimapuiston toteuttamiseksi Huittisissa – hanke yksi Suomen suurimmista
Pour en savoir plus
Contacts projet Huittinen
Chef de projet
Hannes Ojala
+358 40 412 2328
hannes.ojala@ox2.com
Gestionnaire foncier
Isra Alatalo
+358 40 770 9958
isra.alatalo@ox2.com
Tilaa hankkeen uutiskirje
Jos haluat saada ajankohtaista tietoa Huittisten aurinkovoimahankkeen etenemisestä, voit tilata hankkeen uutiskirjeen alla olevasta linkistä.